Hash #1027

Date: 2010-10-02

Planned Hares:
Faris, Aljawasd; Hong, Nguyen Thi; Bacon & Eggs; Flicky Dicky; Frigid Frida

Directions:
1 Take the Chuong Duong (Zuong) Bridge across the Red River, heading East
2 About 3 km after the bridge, at large roundabout, set odometer to zero
3 Turn right onto Nguyen Van Linh, QL5 (National Highway 5) towards Hai Phong
4 At 5.5 km, you come to two sets of traffic signals and an overbridge. Pass under the bridge and turn left onto QL1, heading for Bac Ninh and Lang Son. (Do not turn left at the traffic signal before the flyover, otherwise you are struffed)
5 At 17.6 km pass under an over-bridge and turn right, signed Phat Tich.
6 Take the left fork off the loop road towards Phat Tich. DO NOT cross back over the QL1. You are now on the new dual carriageway road to Phat Tich.
7 At 20.4 km, the dual carriageway ends; continue straight onto the narrow road.
8 At 23.3 km you come to a T-junction, turn left.
9 At 24.1 km turn left onto a concrete village road.
10 At 25.6 km, look for Lang Ba Quoc Hoa on the right and turn right.
11 Go 150 metres to circle

On-On:
TBA

BUS USERS: Usual pick-up at the American Club is confirmed.

B&E +84 904 116 137
FF +84 936 755 100

Turnout: 44 hashers, 5 hares: Flicky Dicky, Faris, Aljawasd, Frigid Frida, Hong, Nguyen Thi, Bacon & Eggs

Leave a Reply