Date: 2016-04-09 | Venue: Nam Phuong Tien B
Planned Hares:
Cardboard Cock and Cunning Stunt
Directions:
Take Thang Long Highway.
15.2km after Big C, exit to side road (sign CHUA THAY)
Continue on the side road for 1 km and then turn right
After 250m, make a U-turn to get onto the bridge
Go straight for 2.6km (road bending slightly right at 1.7km).
Then turn left (sign XUAN MAI, big village gate on the right).
Follow the main road to the end (about 10.5km).
Now turn right into QL6 (AH13).
After 1.1 km, at the roundabout, turn left into QL21 (Ho Chi Minh Road).
Continue on QL21 for 7.1km (passing XI MANG NAM SON factory at 5.8 km on your left)
Now, at Cho Ca, turn right (medium tree with small sign CHUA THIEN SON).
Continue straight for 2.8 km
Get off the bus at the end of a small lake.
Turn right to walk to the circle.
On-On:
New Day Restaurant
72 Ma May
Bring torches
GPS Coordinates: 20°50'07.5"N 105°35'01.7"E
Turnout: 41 hashers, 2 hares: St. Bernard, Cardboard Cock

